UK cost guide · September 2026

How much does it cost to build a house in 2026?

Building a house with a main contractor costs about £2,300 to £2,900 per m² for a mid-range specification in the UK, or £322,000 to £406,000 for a 140 m² home. New homes are zero-rated for VAT. Land, fees, connections and landscaping are extra.

Work out your new build house cost

Loading the calculator…

New build house prices in 2026

Ranges are for a typical home outside London, including VAT, before fees and contingency. Use the calculator for your size, region and finish.

New build house costs by type and finish, UK average outside London, including VAT (September 2026)
TypeBudgetMid-rangePremium
Built by a main contractor (140 m²)£252,000 to £322,000£322,000 to £406,000£420,000 to £560,000
Built by a main contractor new build house by size, including VAT
Floor areaBudgetMid-rangePremium
100 m²£180,000 to £230,000£230,000 to £290,000£300,000 to £400,000
140 m²£252,000 to £322,000£322,000 to £406,000£420,000 to £560,000
200 m²£360,000 to £460,000£460,000 to £580,000£600,000 to £800,000

New build house costs by region

Labour costs vary across the UK far more than materials. London runs about 35% above the UK average and Northern Ireland about 18% below.

New build house costs by region: Built by a main contractor, 140 m², including VAT
RegionMid-range costPer m²
UK average (outside London)£322,000 to £406,000£2,300 to £2,900
London£435,000 to £548,000£3,100 to £3,900
South East£370,000 to £467,000£2,600 to £3,300
East of England£345,000 to £434,000£2,500 to £3,100
South West£335,000 to £422,000£2,400 to £3,000
West Midlands£312,000 to £394,000£2,200 to £2,800
East Midlands£306,000 to £386,000£2,200 to £2,800
Scotland£306,000 to £386,000£2,200 to £2,800
North West£299,000 to £378,000£2,100 to £2,700
Yorkshire and the Humber£296,000 to £374,000£2,100 to £2,700
Wales£290,000 to £365,000£2,100 to £2,600
North East£283,000 to £357,000£2,000 to £2,600
Northern Ireland£264,000 to £333,000£1,900 to £2,400

Want it for your area? See local prices and council building control fees for 92 council areas.

What's included in these prices

Included

  • Foundations, structure and roof
  • Windows, doors and insulation
  • Services, kitchen and bathrooms to the chosen specification
  • Internal finishes

Not included

  • Land
  • Architect, engineer and planning fees
  • Utility connections and site access
  • Landscaping, driveways and garages
  • Community Infrastructure Levy, if it applies

What drives the cost

  • Build route. Managing trades yourself costs less than a main contractor; design-and-build packages cost more.
  • Specification. Glazing, heating systems and finishes move the price most.
  • Site. Slopes, poor ground and difficult access add to foundations and labour.
  • Where you build. London and the South East cost more than most regions.

Planning, regulations and VAT

A new home needs full planning permission and building regulations approval. The construction of a new dwelling is zero-rated for VAT, and self-builders can reclaim VAT on many materials through the DIY housebuilders scheme.

Checklist: what to ask builders to confirm

Print this or save it as a PDF. Mark each line included, separate or not confirmed as quotes come in. An empty amount means unknown, not free.

Use one column per quote if you are comparing builders
ItemWhat to confirmIncluded? Amount?
Land and planningPlot, planning permission and conditions.
DesignArchitect, engineer, surveys and warranties.
BuildContractor price, specification and exclusions.
ConnectionsWater, drainage, electricity, broadband.
External worksDrives, landscaping, boundaries.

Questions people ask

Is there VAT on a new build house?

No. The construction of a new dwelling is zero-rated. Professional fees are still standard-rated.

How much does it cost to build a 3-bed house?

About £322,000 to £406,000 for a 140 m² home built to a mid-range specification by a main contractor, excluding land and fees.

Sources and method

Our ranges combine published 2026 UK cost guides, industry data and our own survey of council fees. We check them every quarter. They are planning figures, not quotes: always get at least three detailed written quotes. Read how Estiquote estimates work, or download the full cost data.