Glossary
Renovation words explained
The words builders, designers and councils use, in plain English. Building rules differ between England, Wales, Scotland and Northern Ireland, so where an entry applies only in some of them, it says which.
A
- AFDD (arc fault detection device)
A device in the consumer unit that switches off a circuit when it detects arcing: small sparks from a damaged cable or a loose connection, which can start a fire. It does a different job from an RCD, which protects people from electric shock. Ask your electrician whether your circuits should have them and whether the quote includes them.
- Approved inspector
The old name for a registered building control approver: a private inspector you can choose instead of the council to check that building work meets the building regulations in England and Wales. They were renamed on 6 April 2024, but quotes still use the old name. If a quote says building control is by an approved inspector, ask whether their fee is in the price.
Sources: SI 2024/104 for England, SI 2024/207 for Wales.
- Article 4 direction
An order by your council that removes some or all permitted development rights in an area, often a conservation area, so work that would normally need no application does. Ask the council’s planning department whether one covers your street.
Source: Planning Portal.
B
- Balustrade
The posts and handrail along the open side of a staircase or landing, which stop anyone falling. A new loft staircase needs one.
- Benchmark checklist
A checklist the installer fills in, usually at the back of the instruction manual, when a new boiler or hot water cylinder is set up, recording that it was installed and commissioned properly. Keep it: manufacturers ask for it if you make a warranty claim.
- Boiler Upgrade Scheme
A government grant in England and Wales towards replacing gas, oil, LPG or electric heating with a heat pump or a biomass boiler. It pays £7,500 towards an air source heat pump. Until 31 March 2027, a home heated by oil or LPG with no mains gas gets £9,000 (£1,500 more). An air-to-air heat pump gets £2,500. Your MCS certified installer applies for it on your behalf.
Sources: GOV.UK, what you can get.
- Boundary
The legal line between your land and your neighbour’s. In England and Wales the title plan from HM Land Registry gives an idea of where it runs, but most title plans don’t show the exact line. Building close to it can bring in planning limits and party wall notices.
Source: GOV.UK.
- Build-over agreement
Permission from your water company to build over, or close to, a public sewer, for example when an extension covers a drain shared with neighbours. Building control checks for it under the building regulations in England and Wales. Ask early, because it can hold up the start.
Source: Approved Document H, requirement H4.
- Building control
The service that checks building work meets the building regulations: your council’s building control team, or a private registered building control approver you choose instead (England and Wales). They inspect the work at key stages and issue the completion certificate.
Scotland: In Scotland the council’s building standards department (the verifier) does this job, through the building warrant; there are no private inspectors. (mygov.scot)
Source: GOV.UK.
- Building notice
A quicker way to get building regulations approval for smaller jobs in England and Wales: you tell building control about the work and can start 2 days later. No plans are approved in advance, so anything the inspector finds wrong has to be put right on site.
Source: GOV.UK.
- Building regulations
The legal minimum standards for building work, covering structure, fire safety, insulation, drainage, electrics and more. They are separate from planning permission: most extensions, loft conversions and structural changes need building regulations approval even when no planning application is needed. Northern Ireland has its own regulations, approved by your district council’s building control.
Scotland: Scotland has its own building regulations (building standards). You need a building warrant before work starts and must submit a completion certificate at the end. (mygov.scot)
Source: GOV.UK.
- Building warrant
Legal permission from your council’s building standards department to carry out building work in Scotland, such as an extension, a loft or garage conversion, or altering a load-bearing wall. You must have it before work starts, and it lasts 3 years.
Source: mygov.scot.
- By others
Wording on a quote that means the item is not included: someone else, often you, has to supply it or arrange it. Add it to your budget separately.
C
- Certificate of lawfulness
The formal name for a lawful development certificate. In Scotland you apply to the council for a certificate of lawfulness of proposed use or development to confirm that planned work doesn’t need planning permission.
Source: Town and Country Planning (Scotland) Act 1997, section 151.
- Chases
Grooves cut into a wall or floor to bury new cables or pipes, which are filled and plastered over afterwards.
- Combi boiler
A combination boiler heats water straight from the mains when you turn on a hot tap, so there is no hot water cylinder or tank in the loft. It suits homes where one shower runs at a time.
- Competent person scheme
A government-approved scheme for tradespeople, such as electricians and heating engineers, that lets a registered installer certify their own work as meeting the building regulations. You then don’t need to apply to building control yourself for that work (England and Wales).
Source: GOV.UK.
- Completion certificate
In England and Wales, the certificate building control issues when it is satisfied the finished work meets the building regulations, usually within 8 weeks. Keep it: a buyer’s solicitor will ask for it when you sell. Hold back the final payment until it is issued.
Scotland: It works the other way round in Scotland: you (or your agent) submit a completion certificate to the council when the work is finished, and the council accepts it if the work meets the building warrant and Scotland’s building standards. It is an offence to move into a new extension before it has been accepted. (Scottish Government procedural handbook, chapter 5)
Source: GOV.UK.
- Conservation area
An area your council protects for its special architectural or historic character. Permitted development is narrower there: in England, for example, side extensions and cladding need planning permission. To find out whether your home is in one, ask your council’s planning department.
Source: Planning Portal.
- Consumer unit
The box, usually near the electricity meter, where the supply is split into separate circuits, each with its own switch that cuts off if something goes wrong. Also called a fuse board. Fitting a new one must be notified under the building regulations in England and Wales.
Source: Planning Portal.
- Contingency
Money you set aside for things nobody can see or price until work starts, such as rotten timbers or poor ground. It is an allowance, not a cost: if nothing goes wrong, you keep it. Estiquote’s budgets hold 15% of the building work (10% for a boiler, unvented cylinder replacement, a heat pump or windows, which are usually fixed prices).
D
- Dormer
A box-shaped extension built out from a sloping roof, with its own window, to give standing room in a loft. A rear dormer is the most common loft conversion.
- Drain diversion
Moving an existing drain or manhole that is in the way of new work, such as an extension. It adds cost, and a public sewer can also need the water company’s agreement (see build-over agreement).
E
- Earth rod
A metal rod driven into the ground outside to give the house its electrical earth, where the electricity supply doesn’t provide one.
- Earthing and bonding
The cables that connect your electrics, and the metal water and gas pipes where they enter the house, to the main earth, so that a fault trips the power instead of making metalwork live.
- Eaves
The lower edge of a roof, where it meets or overhangs the top of the wall.
- EICR (Electrical Installation Condition Report)
An electrician’s report on the condition of your existing wiring, listing anything dangerous or that needs attention. It is worth getting before you buy or renovate an older home, because it tells you whether the wiring can stay. Each problem gets a code: see EICR codes.
- EICR codes (C1, C2, C3, FI)
The codes on an EICR for each problem found. C1: danger present, with a risk of injury, so it needs making safe straight away. C2: potentially dangerous, so it needs putting right. FI: further investigation needed without delay. C3: improvement recommended, but not required. Any C1 or C2 means the report says the wiring is unsatisfactory for continued use; a report with only C3 codes is satisfactory.
Source: GOV.UK.
- Electrical Installation Certificate
The certificate an electrician gives you for new wiring or a new circuit, confirming it was designed, installed and tested to the wiring regulations. Building control needs it before it can sign off the whole job. Keep it for when you sell.
Source: Richmond Council; the wiring regulations are BS 7671.
- Electricity network operator
The company that runs the power cables in your area and the cable into your home: not the supplier you pay for electricity. Heat pumps and electric car chargers at home must be registered with the network operator. A heat pump installer does this for you, and for a bigger installation asks before connecting it, in case your supply needs an upgrade.
- Engineered wood
Flooring made of a thin top layer of real wood glued onto layers of plywood or other board, so from above it looks like a solid wood floor.
- Envelope
The outer shell of a building: walls, roof, windows, doors and ground floor, which keep the weather out and the heat in.
F
- First fix
The work done while walls and floors are still open: running new cables, pipes and heating pipework before plastering.
- Footprint
The area of ground a building covers, measured on the outside of its walls.
- Full plans
A way of getting building regulations approval in England and Wales where building control checks your drawings before work starts. A decision usually comes within 5 weeks, or 2 months if you agree. It is the most thorough route and suits extensions and loft conversions.
Scotland: There is no full plans application in Scotland. You apply to the council for a building warrant, with drawings, and you must have it before work starts. (mygov.scot)
Source: GOV.UK.
- Fuse board
Another name for a consumer unit. Older ones have fuses that hold a thin wire; new ones have switches and RCBO or RCD protection.
G
- Gravity connection
Waste pipes that slope down to the drain or soil stack, so water and waste run away on their own with no pump. If the drain is too far away or too high for that, a pump or macerator is needed instead.
- Groundworks
Everything done in the ground before the walls go up: digging out, foundations, drains and the base of the floor. Costs can change once the ground is opened, so they are often a provisional sum.
H
- Hip-to-gable
A loft conversion where the sloping end of a hipped roof is built up into an upright end wall (a gable), so the loft gets much more headroom. It is often combined with a rear dormer. On a detached house both ends can be done: a double hip-to-gable.
- Hipped roof
A roof that slopes down on every side, including the ends, so the house has no upright end walls in the roof.
- Householder planning application
The planning application for changes to a single house (not a flat), such as an extension or work in the garden. Flats, more than one house and a change of use need a full planning application instead.
Source: Planning Portal.
J
- Joists
The beams, usually timber, laid side by side to hold up a floor or a flat ceiling. A loft conversion needs new, stronger floor joists.
L
- L-shaped dormer
Two dormers joined at a corner: one on the main roof and one on the roof of the back addition (the outrigger), common on terraced houses and also used on semis with a back addition. Estiquote prices it as a loft type of its own, above a rear dormer of the same floor area, because of the second dormer roof and the extra steel.
- Laid to fall
Built with a slight slope so water runs away to a drain or gutter instead of sitting in puddles. Wet room floors and flat roofs are laid to fall.
- Lawful development certificate
A certificate from your council confirming that work you plan (or have done) doesn’t need planning permission. It isn’t compulsory for any house, a semi included: if your loft or extension is within permitted development, you can build without one. It gives you proof in writing, which helps when you sell. Used in England and Wales.
Source: Planning Portal.
- Level access
A doorway or shower with no step or lip to get over, so a wheelchair, walking frame or anyone unsteady can get in easily.
- LLP (limited liability partnership)
A business run by two or more members, registered at Companies House like a company. Its members aren’t personally liable for debts the business can’t pay. Some architects, surveyors and building firms are LLPs.
Source: GOV.UK.
- Local review body
In Scotland, a panel of at least three councillors that looks again at a planning decision made by a council officer, if you ask within 3 months of the decision.
Source: SSI 2013/157, regulations 7 and 9.
M
- Macerator
A small pump fitted behind a toilet (and sometimes a basin or shower) that breaks up the waste and pumps it through a narrow pipe. It is used where the waste can’t run downhill to the soil stack.
- Mains-linked alarms
Smoke and heat alarms wired into the mains electricity, with a battery backup, and linked so that when one goes off they all do.
- Making good
Repairing the walls, floors and ceilings around new work so they are ready to decorate: filling holes, patching plaster and refitting skirting boards. Ask each builder whether it is in the price, because quotes often differ here.
- Mansard
A loft conversion that replaces a roof slope with a very steep, almost upright wall and a nearly flat top, with windows set into it. It gives the most space and usually needs planning permission.
- MCS
The Microgeneration Certification Scheme, which certifies installers of heat pumps and other low-carbon heating. For the Boiler Upgrade Scheme grant you get quotes from MCS certified installers, and the installer applies for you.
Source: GOV.UK.
- Means tested
Only for people whose income, and sometimes savings, are below a set level. A grant that isn’t means tested is open to anyone who meets its other conditions.
- Minor works certificate
The shorter certificate an electrician gives for small changes that don’t add a new circuit, such as an extra socket on an existing one.
Source: Richmond Council.
- Modelled range
A price range worked out from Estiquote’s cost model, which is built from published UK cost guides and our own research, not from a quote for your home. Use it to plan and to ask questions, not as proof that a quote is wrong.
Read more: How Estiquote estimates work.
N
- Notifiable work
Work that must be reported to building control, or self-certified by an installer in a competent person scheme. In England and Wales notifiable electrical work includes a new circuit, a new consumer unit and changes to circuits in a room with a bath or shower. In Wales, work in kitchens and outdoors is also notifiable, even adding a socket or a light.
Sources: Hammersmith and Fulham Council, Planning Portal, Welsh Government.
P
- Pacing it out
Measuring a space by walking it in long, even strides and counting them. One long stride is roughly a metre, so 6 strides is about 6 m. It is close enough for a first price; use a tape measure before you ask for quotes.
- Part P
The part of the building regulations in England and Wales that covers electrical safety in homes. Its guidance, Approved Document P, says which electrical work is notifiable, meaning it must be reported to building control or self-certified by an electrician in a competent person scheme. The work itself should follow BS 7671, the wiring regulations.
Sources: GOV.UK, Welsh Government.
- Party wall
A wall shared with your neighbour, such as the wall between two semi-detached or terraced houses. In England and Wales the Party Wall etc. Act 1996 says you must give your neighbour written notice before working on it, building on the boundary or digging foundations close to their home. If they don’t agree in writing within 14 days, a surveyor (one agreed by both of you, or one each) settles the details in a party wall award, which also decides who pays the surveyors.
Scotland: The Party Wall etc. Act 1996 does not apply in Scotland (the Act says where it applies), so there is no surveyor’s award to fall back on. Don’t start work on a shared wall without your neighbour’s written agreement. If they say no, ask a solicitor who handles property to read your title deeds and theirs and tell you what you may do to the wall, and ask your designer whether the new work can stand inside your boundary instead. If you still can’t agree, a mediation service can help you both reach an agreement. Solicitors and mediation can cost money; legal aid may help if you can’t afford it (mygov.scot).
Sources: section 5, section 10, GOV.UK.
- PC sum (prime cost sum)
An allowance in a quote for something you choose later, such as the kitchen units or tiles. If you choose something dearer than the allowance, you pay the difference.
- Permitted development
Building work you can do without applying for planning permission, because the law already allows it within set limits on size, height and position. The limits differ in England, Wales, Scotland and Northern Ireland, and are tighter in a conservation area or where the council has removed some of them for your area.
Source: Planning Portal, England.
- Preliminaries (prelims)
The costs of running the site rather than building anything: scaffolding, skips, a site toilet and welfare, supervision, insurance and protecting your home. Some builders list them as one line, some spread them through the price.
Read more: What preliminaries cover.
- Prior approval
In England, a way to build a bigger single-storey rear extension than permitted development normally allows (up to 6 m deep on a semi or terrace, 8 m on a detached house) without a full planning application. You tell the council first; it writes to your neighbours, who have at least 21 days to object, and you can build if the council agrees or hasn’t decided within 42 days. It isn’t available in a conservation area.
Sources: Planning Portal, GPDO 2015, Schedule 2, Part 1, Class A, paragraph A.4.
- Programme
The builder’s timetable: what happens when, and how long each stage takes. A very tight programme can mean extra labour or rushed work, so ask how it was set.
- Provisional sum
An amount a builder puts in a quote for work they can’t price yet, such as foundations before the ground has been dug. The final bill goes up or down with the real cost, so ask how each figure was worked out.
R
- RCBO
An RCD and a circuit breaker in one, fitted for each circuit, so a fault on one circuit switches off only that circuit.
- RCD (residual current device)
A safety switch that cuts the power within a split second if electricity leaks to earth, for example through a person. One RCD often protects several circuits at once.
- Registered building control approver
A private inspector you can choose instead of the council to check building work against the building regulations in England and Wales. They tell your council about the work for you. Their fee isn’t published like a council’s: they agree it with you, so ask for a quote and compare it with the council’s charge. Until 6 April 2024 they were called approved inspectors.
Sources: SI 2024/104 for England, SI 2024/207 for Wales.
- Regular boiler
A boiler that heats a hot water cylinder fed by a cold water tank in the loft, usually with a second, smaller tank in the loft for the heating. Also called a conventional or heat-only boiler. The pump and controls are separate from the boiler. Compare a system boiler, which has no tank in the loft, and a combi boiler, which has no cylinder either.
- Roof lantern
A glazed box set on a flat roof, usually with a glass roof of its own, to let daylight into the room below. It costs more than a flat rooflight.
- Rooflight
A window set into a roof slope or a flat roof, lying flat or almost flat with it. Cheaper and simpler than a dormer or a roof lantern.
S
- Second fix
The work done after plastering: fitting sockets, switches, lights, radiators, taps and toilets, then connecting and testing them.
- Site welfare
The toilet, hand washing, shelter and somewhere to eat that a builder must provide for the people working on site. It is part of the preliminaries.
- Skim (a full skim)
A thin new coat of plaster spread over a whole wall or ceiling to give a smooth surface. After a rewire, the grooves cut for cables are filled and patched; if the old plaster is in poor condition, a plasterer may need to skim the whole room (a full skim), which costs more.
- Soil stack
The large upright waste pipe, inside the house or on an outside wall, that takes waste from toilets down to the drains. The further a new toilet is from it, the more the pipework costs.
- Sole trader
Someone who runs a business on their own account, not as a company. They make the decisions, keep the profits after tax and are personally responsible for all the business’s debts. A sole trader isn’t registered at Companies House, because they aren’t a company.
Source: GOV.UK.
- Solid floor and suspended floor
A suspended floor is wooden boards on joists, with a space underneath; a solid floor is concrete laid on the ground. It matters for a rewire: under floorboards, an electrician can lift a few boards and run new cables through the space below, but a concrete floor can’t be lifted, so the cables have to go another way, usually through the walls and ceilings, which takes longer.
- Specification
A written description of exactly what is to be built and with which materials and fittings. The more detailed it is, the easier builders’ quotes are to compare.
- Steel beam (RSJ)
A steel beam, often called an RSJ (rolled steel joist), holds up the wall or floor above when a wall is taken out or a wide opening is made. A structural engineer works out its size, and a wider opening needs a bigger beam.
- Structural engineer
An engineer who works out how the building will stand up: the size of steel beams, lintels, joists and foundations. Their calculations go to building control with the drawings. Most extensions, loft conversions and knock-throughs need one.
Scotland: In Scotland, an engineer registered as an approved certifier of design can certify that the structure meets Scotland’s building standards. The council must accept that certificate instead of checking the structure in detail, and the building warrant fee is a little lower. (Scottish Government procedural handbook, sections 3.3.6 and 3.14.7)
- Stud wall
A wall made of a timber or metal frame covered with plasterboard. It divides rooms but doesn’t usually hold anything up.
- Surge protection (SPD)
A surge protection device (SPD) in the consumer unit that protects the wiring and anything plugged in from brief spikes in voltage, for example from a lightning strike nearby.
- Surveyor’s award (party wall award)
In England and Wales, the written decision a party wall surveyor makes when a neighbour hasn’t agreed in writing to work under the Party Wall etc. Act 1996. It is made by one surveyor both of you agree on, or by two of the three surveyors (one each, and a third they choose), and it sets out whether and how the work can be done, when, and who pays the surveyors’ costs. Either of you can appeal to the county court within 14 days of receiving it.
Scotland: There is no surveyor’s award in Scotland, because the Party Wall etc. Act 1996 does not apply there (the Act says where it applies). See party wall for what to do instead.
Sources: section 10, GOV.UK.
- System boiler
A boiler that heats a hot water cylinder, usually in an airing cupboard, with the pump and controls built in and no tank in the loft. With an unvented cylinder it suits homes where two showers may run at once.
T
- Tanking
Waterproofing a floor and the lower walls, for example in a wet room or a cellar, so water can’t get through to the structure.
- Thermostatic shower
A shower with a valve that keeps the water at the temperature you set, even when someone turns on a tap elsewhere in the house.
- Title deeds
The documents that show who owns a property and any rights or restrictions on it. In England and Wales most are held by HM Land Registry as a title register and a title plan, which gives an idea of where the boundaries run but usually not the exact line; in Scotland by Registers of Scotland.
Sources: GOV.UK, property boundaries.
- Trial holes
Small holes dug before work starts to see what the ground is like, how deep the foundations need to go, or where existing foundations and drains are.
U
- Unvented cylinder
A hot water cylinder fed straight from the cold water mains, with no tank in the loft, so taps and showers get mains pressure. Because the water is stored under pressure, it must be fitted by a qualified installer and the work comes under the building regulations.
Source: East Lindsey District Council.
- uPVC
A hard plastic (unplasticised PVC) used for most window frames, doors, fascias and gutters. It is usually cheaper than timber or aluminium.
V
- VAT
Value added tax. A VAT-registered builder adds 20% to most work on an existing home; a trader who isn’t registered charges none on their labour. Some work is charged less: building a new home is zero rated, so is fitting heat pumps, solar panels, batteries and insulation in a home until 31 March 2027, and renovating a home that has been empty for 2 years or more can be 5%. Always check whether a quote includes VAT before you compare it.
Sources: HMRC VAT Notice 708, VAT Notice 708/6.
W
- Wall plate
A length of timber fixed along the top of a wall that the roof rafters or ceiling joists sit on.
- Wet room
A bathroom with an open shower on a floor that is laid to fall to a drain, with the whole floor and the lower walls waterproofed (tanked). It usually has level access.
Z
- Zero rated
Zero rated means no VAT: the rate is 0%. Building a new home is zero rated, and so is fitting a heat pump or insulation in a home until 31 March 2027. Building or adapting a bathroom, washroom or toilet to suit the condition of a disabled person, in their own home, can be zero rated too. Age alone doesn’t qualify: what counts is a long-term illness or disability that makes everyday activities hard, such as using the stairs, and you don’t need to be registered as disabled.
Sources: VAT Notice 708, VAT Notice 708/6, VAT Notice 701/7, sections 3.1, 3.2.1 and 6.3.
Sources
Each rule above links to the official source it was checked against on 28 October and 4 November 2026. This page explains words; it is not legal advice, so check your own project with your council or designer.
- GOV.UK: building regulations approval
- GOV.UK: how to apply for building regulations approval
- The Building Safety Act 2022 (Commencement No. 7 and Transitional Provisions) Regulations 2024 (SI 2024/104)
- The Building Safety Act 2022 (Commencement No. 4, Transitional and Saving Provisions) (Wales) Regulations 2024 (SI 2024/207)
- mygov.scot: getting a building warrant
- Scottish Government: building standards procedural handbook, third edition, version 1.9
- Party Wall etc. Act 1996, section 5
- Party Wall etc. Act 1996, section 10
- GOV.UK: party walls and building work
- Planning Portal: extensions, planning permission (England)
- The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4 (prior approval)
- Planning Portal: lawful development certificates
- Town and Country Planning (Scotland) Act 1997, section 151
- The Town and Country Planning (Schemes of Delegation and Local Review Procedure) (Scotland) Regulations 2013
- HMRC: buildings and construction (VAT Notice 708)
- HMRC: energy-saving materials and heating equipment (VAT Notice 708/6)
- GOV.UK: apply for the Boiler Upgrade Scheme
- GOV.UK: Boiler Upgrade Scheme, what you can get
- Planning Portal: electrics, building regulations
- Hammersmith and Fulham Council: home electrical safety
- Richmond Council: building regulations and electrical works
- East Lindsey District Council: unvented hot water storage systems
- GOV.UK: Approved Document H, drainage and waste disposal (requirement H4, building over sewers)
- GOV.UK: get information about property and land
- GOV.UK: your property boundaries
- Welsh Government: building regulations, electrics
- GOV.UK: Approved Document P, electrical safety, dwellings
- HMRC: reliefs from VAT for disabled and older people (VAT Notice 701/7)
- GOV.UK: electrical safety standards in the private and social rented sectors, guidance
- Planning Portal: householder planning consent
- Party Wall etc. Act 1996, section 22 (extent)
- GOV.UK: set up as a sole trader
- GOV.UK: set up and run a limited liability partnership (LLP)
- mygov.scot: resolve a dispute with your neighbour
- GOV.UK: how to register energy devices in homes or small businesses (Department for Energy Security and Net Zero)
- MCS: notifying DNOs (network operators)